<sup id="eiu00"></sup>
    <pre id="eiu00"><var id="eiu00"></var></pre>
    <p id="eiu00"><li id="eiu00"></li></p>
  1. 国产午夜精品福利91,国产男女插插一级,最新久久成人国产精品视频免费 ,久久一本精品久久久ー99,色www视频永久免费,亚洲人片在线观看天堂无码,日本少妇,成人无码a片一区二区三区免
    您好,歡迎來到濟南通宇恒成自動化工程有限公司網站!

    服務熱線

    當前位置: 首頁- 新聞中心 > 客戶見證
    常見問題
    新聞中心

    MNS低壓配電柜安裝規范是什么?

    發布時間:2021-05-17 來源:http://m.aivkv.cn/ 瀏覽量:

    1.安裝前對準備工作的檢查
    1. Check the preparation before installation
    在安裝前,MNS低壓抽屜柜監理工程師及甲方工程師要檢查進場道路是否暢通,必要時要求要求總包單位修建簡易運輸通道與各安裝點連接,施工場地布置應滿足文明施工的要求。同時還應檢查安裝單位的施工機具安排狀況,督促安裝單位對施工機具進行檢查,確保狀態良好。壓設備到達現場前,配電室、地溝、基礎槽鋼應已完全竣工
    Before installation, the supervision engineer of MNS low-voltage drawer cabinet and the engineer of Party A shall check whether the access road is smooth. If necessary, the general contractor is required to build a simple transportation channel to connect with each installation point, and the construction site layout shall meet the requirements of safe and civilized construction. At the same time, the arrangement of construction machines and tools of the installation unit should be checked, and the installation unit should be urged to check the construction machines and tools to ensure that they are in good condition. Before the pressure equipment arrives at the site, the distribution room, trench and foundation channel steel shall be completely completed
    1)、配電室
    1) . distribution room
    配電室:配電室施工前,低壓配電柜要將建配電室所需的詳細圖紙交予施工方(合同簽訂后2周內,重 點要落實客戶對圖紙的位置、內容、完成時間確認),并且在配電室建設過程中,我方或協作單位的技術人員要在現場監督,避免施工錯誤。(配電室建設大約需2周左右)
    Distribution room: before the construction of the distribution room, the low-voltage distribution cabinet shall submit the detailed drawings required for the construction of the distribution room to the construction party (within 2 weeks after the signing of the contract, the key point is to confirm the location, content and completion time of the drawings by the customers), and during the construction of the distribution room, the technical personnel of our party or the cooperating unit shall supervise on site to avoid construction errors( It will take about 2 weeks to build the distribution room)
                               MNS低壓抽屜柜
    2)、地基:MNS低壓抽屜柜槽鋼安放位置要與配電室預留的設備風道相對應,設備離墻的小距離要明確(距離太近,設備的柜門打不開)。(槽鋼焊接大約需2天,我方技術人員必須到場指導)
    2) Foundation: the channel steel of MNS low-voltage drawer cabinet should be placed in the position corresponding to the equipment air duct reserved in the power distribution room, and the small distance between the equipment and the wall should be clear (the distance is too close to open the cabinet door of the equipment)( It takes about 2 days to weld the channel steel, and our technicians must be present for guidance.)
    設備到達現場:
    Equipment arrival at site:
    3)、若配電室、地基若未建好,低壓配電柜設備要有存放位置(要防雨或提供必要的防雨材料)。
    3) If the power distribution room and foundation are not built, the low-voltage power distribution cabinet equipment should have a storage location (rain proof or provide necessary rain proof materials).
    2.安裝
    2. Installation
    2.1各配電房門窗須嚴密,低壓配電柜房內清潔。
    2.1 the doors and windows of each distribution room shall be tight, and the low-voltage distribution cabinet room shall be clean.
    感謝您的閱讀,希望以上內容對您有所幫助,如您想了解更多精彩內容請點擊我們的官網:MNS低壓抽屜柜http://m.aivkv.cn
    Thank you for reading, hope the above content is helpful to you, if you want to know more wonderful content, please click our official website: MNS low voltage drawer cabinet http://m.aivkv.cn .
    首頁首頁 產品產品 電話電話 置頂置頂
    主站蜘蛛池模板: 亚洲国产精品无码一区二区三区| 国产探花AV在线日韩精品| 国产在线精品熟女| 精品久久久中文字幕人妻| 国产真人性做爰久久网站| 免费网站污| 黄片视频在线观看| 国产精品人妻在线观看| 综合一区二区三区| 一本色道久久爱88av| 人妻?制服?丝袜| 衣服被扒开强摸双乳18禁网站| 亚洲第一区av| 先锋影音图片资源网| 日本边添边摸边做边爱| 国产在线码观看超清无码视频| 美女黄网站视频免费视频| 国内精品伊人久久久久AV一坑 | 人妻体体内射精一区二区| jlzz大jlzz大全免费| 国产富婆一区二区三区| 农村拗女一区二区三区| 樱桃视频影院在线播放| xxx久久| 欧美日本精品一本二本三区| 久久综合色之久久综合| 无毒无码不卡| 欧美精品福利| 人人妻久久人人澡人人爽人人精品| 欧美三级在线| 99热这里只有精品免费播放 | 老司机夜间福利| 亚洲午夜成aⅴ人片| 青青草乱人| 综合色一色综合久久网| 国产性爱网| 亚洲男人第一无码av网站| 亚洲精品国品乱码久久久久| 亂倫近親相姦中文字幕| 成人α片免费视频播放在线| 国产精品片AV片在线观看|